dc.contributor.authorSturgeon, Madelyn
dc.contributor.authorOwens, Justin
dc.contributor.authorBohlen, Paul
dc.date2022-05-02
dc.date.accessioned2022-05-02T13:46:03Z
dc.date.available2022-05-02T13:46:03Z
dc.identifier.urihttp://hdl.handle.net/20.500.12419/790
dc.description.abstractThe purpose of this project was to redevelop the site and build an administrative building for the State Bank of Whittington. The preexisting site consisted of five single-residential homes, one small commercial building, and two small parking lots. These structures were demolished, and the parking lots were removed. The proposed building is an 8,305 square foot, single story building that was designed to equip offices and conference rooms. The drainage system for the site collects all storm water runoff from the roof, parking lot, and surrounding areas into two detention basins that drain into the preexisting city storm sewer. In addition to the site design, the administration building was structurally designed. The post construction site will consist of one, steel frame, administration building, one parking lot, and a sufficient draining system. Collectively, the site and structural aspects were designed to meet the project and community’s needs.
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 International*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectstructural designen_US
dc.subjectdrainage designen_US
dc.titleDrainage & Structural Design - Administration Building for the State Bank of Whittingtonen_US
html.description.abstractThe purpose of this project was to redevelop the site and build an administrative building for the State Bank of Whittington. The preexisting site consisted of five single-residential homes, one small commercial building, and two small parking lots. These structures were demolished, and the parking lots were removed. The proposed building is an 8,305 square foot, single story building that was designed to equip offices and conference rooms. The drainage system for the site collects all storm water runoff from the roof, parking lot, and surrounding areas into two detention basins that drain into the preexisting city storm sewer. In addition to the site design, the administration building was structurally designed. The post construction site will consist of one, steel frame, administration building, one parking lot, and a sufficient draining system. Collectively, the site and structural aspects were designed to meet the project and community’s needs.en_US
dc.contributor.affiliationUniversity of Southern Indianaen_US


Files in this item

Thumbnail
Name:
Proposal_Drainage and Structural ...
Size:
1.575Mb
Format:
PDF
Description:
Proposal

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivatives 4.0 International
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivatives 4.0 International